• 登录
社交账号登录
HOME > SOLUTIONS > CONSTRUCTION > dam monitoring

Dam monitoring

Monitoring content

The main monitoring contents are as follows:

Ø   Surface deformation monitoring

Ø   Internal deformation monitoring

Ø  pressure monitoring

Ø   flow monitoring

Ø   Soil pressure monitoring

Ø  stress monitoring

Ø level monitoring

Ø  monitoring

Ø   Temperature monitoring

Monitoring programs

The schematic diagram of the monitoring plan is as follows:

                                              Dam Monitoring (Figure 1)

The specific monitoring plan is as follows:

Monitoring content

Monitoring parameters

Monitoring method

part

Deformation Monitoring

Surface displacement deformation

GPS positioning system

Pull Wire Displacement Meter

On both sides of the rock or solid soil foundation

Internal displacement deformation

Guide Wheel Fixed Inclinometer

Drilling

Stress Strain Monitoring

Concrete stress

Surface strain gauge, embedded strain gauge

Stress in concrete dam interior and concrete slab of earth-rock dam

Infiltration line monitoring

Seepage monitoring

Pore pressure gauge

Drilling

water level monitoring

Reservoir level

Pore pressure gauge

reservoir

Volume monitoring

Changes in the internal volume of concrete

No stress gauge

Mass cast concrete section

pressure monitoring

contact earth pressure

earth pressure box

concrete

Precipitation monitoring

rainfall

rain gauge

on the stable dam

system advantages

Ø   It has the functions of automatic collection, transmission, storage, processing and analysis and comprehensive early warning of water conservancy dam operation data, and can conduct all-weather real-time monitoring under various climatic conditions;

Ø   has the functions of basic data management, real-time display and release of various monitoring contents, graphic report production, data analysis, comprehensive early warning, manual observation and input, lightning protection, anti-interference, data backup, power failure protection, self-diagnosis and fault display;

Ø system monitoring platform has professionalism and integration, video monitoring and intelligent analysis in the warehouse area, and optimized design; the system software has the corresponding interface to support and display the monitoring platform of the Safety Supervision Administration; the terminal display screen of the monitoring room can display all monitoring objects at the same time, and Can be switched arbitrarily;

Ø   The data can be displayed graphically, including the relationship between water level and flow, water level hydrograph, rainfall histogram, seepage pressure, seepage hydrograph, time history curve, X/Y coordinate graph, simulation graph, histogram, histogram, etc.

Ø   The archival period of power and historical data is not less than 30 days, and the alarm data and automatic screenshots are kept for at least 5 years, and it has the function of intelligent analysis and alarm.

Ø   Internet information release: All information is released through the Internet. As long as the Internet is available, users can use mobile phones, tablets and other terminal devices to know the running status of these sites anywhere.

Monitoring basis

 

1) Project-related survey and design materials and bidding documents;     

2) "Engineering Measurement Specification" ( GB50026-2007 );     

3) "Detailed Rules for Safety and Quality Management of Construction Division";     

4) "Technical Specifications for Safety Monitoring of Earth-rock Dams" ( SL551-2012 );     

5) "Code for Compilation of Earth-rock Dam Safety Monitoring Data" ( DL/T 5256-2010 );     

6) "Technical Specification for Dam Safety Monitoring Automation" ( DL/T5211-2005 );     

7) "Basic Technical Conditions of Dam Safety Automatic Monitoring System Equipment" ( SL268-2001 );     

8) "Technical Specification for Concrete Dam Safety Monitoring" ( SL601-2013 );     

9) "Concrete Dam Safety Monitoring Data Compilation Regulations" ( DL/T5209-2005 );     

10) "National First and Second Class Leveling Standards" ( GB12897-2006 );  

11) "National Third and Fourth Level Leveling Standards" ( GB12898-2009 );  

12) "Medium and Short-Range Photoelectric Ranging Specifications" ( GB/T16818-2008 );  

13) "National Triangulation Specification" ( GB/T17942-2000 );  

14) "Water Level Observation Standard" ( GB/T50138-2010) ;  

15) "Code for Construction Measurement of Water Conservancy and Hydropower Engineering" ( DL/T5173-2003 );  

16) "Technical Specification for Cement Grouting Construction of Hydraulic Buildings" ( DL/T5148-2012 ).  

17) Design drawings and other relevant technical specifications;